Maintenance
Simulating DDoS attack.
Resolved Apr 18 at 10:25am PKT
InfoSec team is simulating a DDoS attack. Meanwhile, the application is accessible through specific IPs.
In parallel, we're switching endpoints from the .tech to the .com domain for monitoring.
Simulating DDoS attack
Resolved Apr 18 at 10:07am PKT
InfoSec team is simulating a DDoS attack. Meanwhile, the application is accessible through specific IPs.
Pen-testing
Resolved Apr 14 at 03:32pm PKT
The infoSec team was doing pen testing that's why some of our endpoints were responding with unexpected status codes.
Packages installation
Resolved May 12 at 03:38pm PKT
This maintenance happened due to packages installation required on test environment.
Maintenance
Resolved May 09 at 06:51pm PKT
Scheduled maintenance due to some major changes.
Under Maintenance due to DB changes
Resolved May 04 at 04:37pm PKT
There are DB changes that need to be implemented on production after testing on development, test, and staging environments respectively.
Under Maintenance due to DB changes
Resolved May 04 at 03:16pm PKT
There are DB changes that need to be implemented on production after testing on development, test, and staging environments respectively.
Redis disconnected
Resolved May 04 at 01:27pm PKT
The dev team is doing testing that's why we've to disconnect the Redis cluster.
New Database testing
Resolved May 04 at 12:10pm PKT
The dev team is doing testing with the new Database.
Database changes test
Resolved May 03 at 02:05pm PKT
Dev team is doing testing with new Database.